View of the construction work for the laying of the tram tracks under the ground in Allersberger Strasse and Bayernstrasse. This is being carried out so that the tram is not disturbed in its operation by the marching columns of the SS Barracks and the crowds attending the rallies which take place on the neighbouring Nazi Party Rally Grounds.